Tuesday, January 11, 2011

Bath progress

Back before Christmas I posted about our Master bath redo from Katrina screw-ups. It’s still a work in progress with 3 steps forward a couple backwards.

Shower seat in the old tile, grout all cracking and full of holes caused leaking. Before:

100_1793

Old tile and grout torn off and new cement board installed.

100_1805

Since we didn’t have any leftover origanal tiles and not wanting to have same issue, we decided to buy new marble to match the Breccia Oniciata on the tub surround and sink vanity. I love this marble, it even has veins of turquoise green running through it. Step up that glass surround will sit on:

100_1806

New seat and step up:

100_1812

Close of marble Breccia Oniciata:

100_1808

100_1830

100_1831

The day before Christmas Eve, the glass company installed the glass surround and we were instructed not to use it for 48 hours. Not fun having all that mess, workers in and out constantly, and cleaning up the days before Christmas.

100_1832

The tub had plenty of issues too. For one, it was floating, not on cement. See below:

100_1829

The original installers left this gaping hole in the marble and never put the silicon around the tub. New contractor sprayed about 10 tubes of foam that hardens rock solid under the tub. Cute Brazilian guy cut out a piece of Breccia Oniciata leftover from shower marble fixes.

100_1788

My other 2 bathrooms desperately needed new faucets, nozzles, etc. Bath 2 looked like this:

100_1819

Now looks like this: (colors are all weird and not true)

100_1824

and this:

100_1823

Bath 3 before:

100_1820

After:

100_1825

But the bad thing is, it’s difficult to find these three faucet fixtures since the new plumbing codes. I searched forever to find them online in oil rubbed bronze. And the really, really bad thing is I ended up with this:

100_1827

and this:

100_1848

100_1849

Yes, the plumber had to cut holes behind these 2 tubs otherwise we would have to tear out the shower/tubs and start all over again. Way too much money. I hope that tomorrow the sheetrock/painter guy can finish up. I’ve had it with the mess, the crap they drop, the in and out of my house tracking in dirt and leaves.

But I love my new bathrooms!

10 comments:

nomo wino daph said...

Oh my friend, I am so sorry for all the issues. I hope it's all over soon for you.

It looks fantastic. I am so loving your shower girl. I hope soon you an get in that big tub with an even bigger glass of wine!

Suburban Stitcher said...

Oh goodness...It already looks so good! I know that it's been a hard road. Renos are hard enough...especially worse I imagine when it's a "fix". Hope that this fix lasts much longer than the last one :) {{{hugs}}}

Rose H (UK) said...

Your improvements are really fabulous, I'm sure all the dust, dirt and inconvenience will soon be a distant memory :o)

Donna said...

Looks like it is going to be wonderful!!

Sandra said...

Sorry for the mess, but it is gorgeous! The marble is so, so pretty. Hugs sweetie. Xoxo

Terri said...

I've got the matching hole in my sheetrock over here in Louisiana! Doing the same thing here, had to replace two handled tub/shower fixtures and got told all kinds of false information. A very reputable company showroom salesman told me that only Price Pfister sells those two handled fixtures. A total and complete lie! I finally found my way to a knowledgeable guy who runs a small company with no fancy showroom but wonderful prices who helped me muddle through. Still waiting on the fixtures to come in though....

The Single Nester said...

I love that bench in the shower. I have always wanted one.

Amy Chalmers said...

I wanted to tell you that you won my sketch giveaway! I couldn't find any email address for you so I am leaving you a comment on your blog. Please contact me @ amymaisondecor@gmail.com

Heather said...

The new bathrooms do look great! I am sorry for the hassle though.

EFT Therapy said...

What a great start. Those bathroom improvements sure looks good!